Other information:
Inspection
Wrap tin foil around the end of the voltmeter test lead to
prevent damaging the heater line. Apply finger pressure on the tin foil,
moving the tin foil along the grid line to check for open circuits.
1.
Turn on the defogger switch and use a voltmete ...
Inspection
1.
Check for resistance between terminals in each switch position.
[Voice + Bluetooth]
[Voice + Bluetooth]
SwitchConnector terminalResistance (±5%)Output voltage (± 0.22)Voice2-410.71 k?3.5 V ± 0.22Call off2-418.91 k?4.0 V ± 0.22Call2-440.91 k?4.5 V ± 0.22
Removal
1.
...