Be sure to read and follow the “General Safety Information
and Caution” before doing any work related with the high voltage
system. Failure to follow the safety instructions may result in serious
electrical injuries.
•
Be sure to shut off the high voltage before doing any work
related with the high voltage system(Refer to "High Voltage Shut-off
Procedure"). Failure to follow the safety instructions may result in
serious electrical injuries.
When removing the battery pack assembly to inspect the
battery system, it can be connected to vehicle by using the SST
0K918-E4100, 0K375-E4100, 0K375-E4200. Before installing the battery
system assembly, check if the battery is OK by using the SST.
Main Relay (-) Inscpection
[Using multi tester (Relay OFF)]
Inspect the high voltage main relay (-) by using multi tester when the relay is off
1.
Shut off the high voltage.
(Refer to Battery Control System - "High Voltage Shut-off Procedure")
2.
Remove the high voltage battery upper case.
(Refer to High Voltage Battery System - "Case")
3.
Measure the resistance between the high voltage (-) power terminal and the Inverter (-) terminal.
Specification : ??(20°C)
[Using GDS (Relay ON)]
1.
Shut off the high voltage.
(Refer to Battery Control System - "High Voltage Shut-off Procedure")
2.
Remove the high voltage battery upper case.
(Refer to High Voltage Battery System - "Case")
3.
Connect the SST No: 0K918-E4100, 0K375-E4100, 0K375-E4200 to the vehicle.
4.
Connect the GDS to DLC.
5.
Turn the ignition switch ON.
6.
Activate the main relay (-) by using "Actuation Test" on the GDS as shown in the illustration below.
When the relay is ON, there is a relay operation sound.
Main Relay Coil Resistance
1.
Shut off the high voltage.
(Refer to Battery Control System - "High Voltage Shut-off Procedure")
2.
Remove the power relay assembly (PRA).
(Refer to High Voltage Battery System - "Power Relay Assembly (PRA)")
3.
Measure the resistance of the main relay (+) (between the
No.6 and the No.10) and the main relay (-) (between the No.4 and the
No.6).
Specification : 21.6 ~ 26.4 ? (20°C)
Removal
Main Relay, Pre Charge Relay, Pre Charge Resistor, Battery
Current Sensor, High Voltage Battery Heater Relay and the High Voltage
Battery Heater Fuse are integrated in the Power Relay Assembly (PRA). So
Refer to the removal procedure of Power Relay Assembly (PRA).
Installation
Main Relay, Pre Charge Relay, Pre Charge Resistor, Battery
Current Sensor, High Voltage Battery Heater Relay and the High Voltage
Battery Heater Fuse are integrated in the Power Relay Assembly (PRA). So
Refer to the installation procedure of Power Relay Assembly (PRA).
System Circuit Diagram
With High Voltage Battery Heater System
Without High Voltage Battery Heater System
Circuit Diagram
Without High Voltage Battery Heater System
With High Voltage Batt ...
Inspection
Check the pads for excessive wear, discs for run out and wear, and calipers for fluid leakage.
Front Brake
Front Brake Disc Thickness Check
1.
Check the brake pads for wear and fade.
2.
Check the brake disc for damage and cracks.
3.
Remove all rust and contamination fro ...