Kia Soul EV: High Voltage Battery System / Quick-Charger Relay Assembly (QRA) Description and Operation

Kia Soul EV (PS EV) 2015-2020 Service Manual / EV Battery System / High Voltage Battery System / Quick-Charger Relay Assembly (QRA) Description and Operation

Description
Quick Charge Relay Assembly (QRA) is installed in the high voltage joint box and it consists of main relays which control the high voltage. The QRA controls the high voltage between the high voltage battery pack and the high voltage joint box by BMS control signal. If the QRA operates, the PRA operates too.
[Main Function]
1.
During rapid charge, it acts as a switch that supplies high voltage to the battery pack.
2.
The role of preventing the overcharge

Operation

Power Relay Assembly (PRA) Repair procedures
Removal     • Be sure to read and follow the “General Safety Information and Caution” before doing any work related with the high voltage system. Failure t ...

Quick-Charger Relay Assembly (QRA) Repair procedures
Removal     QRA is integrated into the high voltage joint box and so each part cannot be replaced separately. Refer to removal procedure of high voltage joint box. Ins ...

Other information:

Kia Soul EV (PS EV) 2015-2020 Service Manual: General Safety Information and Caution


Safety Precaution     Since electric vehicles contain high voltage batteries, mishandling the high voltage system or vehicle may lead to a serious accident, including electric shock and electric leakage.     • Be sure to shut o ...

Kia Soul EV (PS EV) 2015-2020 Service Manual: Hands Free Mic Repair procedures


Inspection 1. Disconnect the negative (-) battery terminal. 2. Remove the overhead console lamp. (Refer to Body Electrical - "Overhead Console Lamp") 3. Remove the hands free mic (A) from the overhead console lamp by loosening the mounting screws. No.Description1Mic (+)2Mic (-) ...

Copyright © www.ksoulev.com 2020-2025